Question 131

An engineer is designing a point-to-multipoint mesh network. Which two AP configurations must be completed for a site survey? (Choose two.)
  • Question 132

    An engineer working for an enterprise deployed multiple Cisco WLCs. A controller that sits in the R&D division is connected through a firewall and is part of the same mobility group. The engineer must ensure that the mobility tunneling is available through the firewall and test it as R&D engineers roam the production floor within their department. How is this requirement met?
  • Question 133

    A customer has a central Cisco WLC that manages APs in FlexConnect mode. The wireless infrastructure supports multiple small branches. One branch deploys new CCX wireless phones that are authenticated by a central Cisco ISE via PEAP/IMSCHAPv2, and trac is switched locally. The customer must reduce the number of full authentication requests and optimize roaming for the new phones. Which action accomplishes the requirement?
  • Question 134

    A customer has two locations named building 1 and building 2 Each location has a Cisco wireless network with these components Building 1
    * 2 Cisco Catalyst 9800 Series Wireless Controllers in a high availability cluster
    * 50 Cisco Catalyst 9100 APs
    * Contractor SSID in VLAN 100
    * Corporate SSID in VLAN 200
    * mobility group configured to the building 2 WLCs
    Building 2
    * 2 Cisco Catalyst 9800 Series Wireless Controllers in a high availability cluster
    * 20 Cisco Catalyst 9100 APs
    * Contractor SSID in VLAN 300
    * Corporate SSID in VLAN 400
    * mobility group configured to the building 1 WLCs
    The customer has a new security requirement mandating that all contractor SSID traffic must terminate on VLAN 100 on the building 1 WLCs for all locations. Which design approach must the engineer take?
  • Question 135

    An engineer is conducting a Layer 2 site survey. Which type of client must the engineer match to the survey?