Question 21

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
  • Question 22

    Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
    How is the resulting firming interval specified in this scenario?
  • Question 23

    Where in the SAP ECC system can you define production versions?
  • Question 24

    Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
  • Question 25

    After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
    Which of the following planning file entries for this material are set by the system?