Question 31

A network architect is choosing design options for a new SD-WAN installation that has the following requirements:
All network traffic from the cloud must pass through inspection devices in a dedicated data center.
Ensure redundancy.
Centralize egress traffic.
Which of the following network topologies best meets these requirements?
  • Question 32

    An architect needs to deploy a new payroll application on a cloud host. End users' access to the application will be based on the end users' role. In addition, the host must be deployed on the 192.168.77.32/30 subnet.
    Which of the following Zero Trust elements are being implemented in this design? (Choose two.)
  • Question 33

    A company is experiencing multiple switch failures. The network analyst discovers the following:
    * Network recovery time is unacceptable and occurs after the shutdown of some switches.
    * Some loops were detected in the network.
    * No broadcast storm was detected.
    Which of the following is the most cost-effective solution?
  • Question 34

    A partner is migrating a client from on-premises to a hybrid cloud. Given the following project status information, the initial project timeline estimates need to be revised:

    (Refer to image: Phases like Discovery, Design, Implementation, and Knowledge Transfer have all exceeded their initial estimated timelines.) Which of the following documents needs to be revised to best reflect the current status of the project?
  • Question 35

    A company's IT department is expected to grow from 100 to 200 employees, and the sales department is expected to grow from 1,000 to a maximum of 2,000 employees. Each employee owns a single laptop with a single IP allocated. The network architect wants to deploy network segmentation using the IP range 10.0.0.0
    /8. Which of the following is the best solution?