Question 41

Process specifications are step-by-step set of instructions describing how the product is made this information is usually recorded an:
  • Question 42

    is the number of periods 1, in which changes are not expected due to excessive cost caused by schedule disruption.
  • Question 43

    Alter the load or the change the capacity awareness. These are the two ways of:
  • Question 44

    Production activity control activities in manufacturing planning and control may also be called:
  • Question 45

    * High quality level
    * High flexibility to change such things as volume, specifications, and delivery
    * High service level
    * Short lead times
    * Low variability in meeting targets
    * Low cost
    These are general requirements of: