Question 6
Master production schedule, inventory records and bills of material are three major inputs to
Question 7
All of the following are ways to achieve financial objectives EXCEPT:
Question 8
The usual process is to start with the due date and, using the lead times, to work back to find the start date for each operation, this process is known as:
Question 9
To design products for low-cost manufacture requires close coordination between product design and process design, which is called:
Question 10
Capacity needs to be measured on following levels EXCEPT: