Question 41
What order do the following corrective action steps normally take for nonconforming product?
. Analyze the problem.
. Assign responsibility.
. Take preventive action.
. Evaluate potential importance.
. Investigate possible causes.
. Analyze the problem.
. Assign responsibility.
. Take preventive action.
. Evaluate potential importance.
. Investigate possible causes.
Question 42
Normally, complaint data for both a product or service organization should provide
Question 43
The example of a supplier's quality management effort to meet your existing contractual requirements is MOST like
I. A product audit.
II. A process audit.
III. A system audit.
I. A product audit.
II. A process audit.
III. A system audit.
Question 44
The example of a supplier's quality management effort to meet your existing contractual requirements is MOST like
. A product audit.
. A process audit.
. A system audit.
. A product audit.
. A process audit.
. A system audit.
Question 45
A single sampling plan calls for a sample size of 80 with an acceptance number of five and a rejection number of six If the quality of the submitted lots 10 percent defective. then the percent of lots expected to be accepted in the long run is approximately.