Question 121
As a Senior Test Manager for a large UK based software company, you have been tasked with setting up an outsourced test facility in another country and another time zone. Test effort will be equally split between the UK and the outsourced test facility.
Which of the following factors is MOST LIKELY to lead to the success of the new working arrangement?
a. Introduce clearly defined lines of communication.
b Increase the use of informal test execution.
c Align the testing methodologies used at each site
d. Implement a weekly team meeting where reps from each site attend in person.
e. Increase the overlap of allocated testing tasks.
f. Introduce local defect management processes for each site.
Which of the following factors is MOST LIKELY to lead to the success of the new working arrangement?
a. Introduce clearly defined lines of communication.
b Increase the use of informal test execution.
c Align the testing methodologies used at each site
d. Implement a weekly team meeting where reps from each site attend in person.
e. Increase the overlap of allocated testing tasks.
f. Introduce local defect management processes for each site.
Question 122
You have been looking at the actual vs expected defects in one high risk area of the software The actual is much higher than the expected value What should you do?
Question 123
Assume that you are working for a company that has maintained and tested a car parking permit system for many years. The system holds the name and address of permit holders and automatically writes to the permit holder with a form to renew or cancel their permit each year.
The test plan states the following:
"since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing" Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system;
* The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan?
SELECT ONE OPTION
The test plan states the following:
"since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing" Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system;
* The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan?
SELECT ONE OPTION
Question 124
In addition to introducing the new team member, you have decided to raise motivation. Which of the measures listed below would be the best measure to take in order to increase the motivation of the team? 2 credits
Question 125
Which of the following is a generic good practice when evaluating and selecting a test tool?