Question 21
Which technique will assist you in determining targeted improvement areas to reduce the number of defects? [1]
Question 22
Assume that you are part of a team conducting test design for a new university system that will allow students to update their own personal information. The Test Strategy states that positive and negative testing should be carried out. along with performance, security and interoperability testing against all new requirements.
The following requirements have been identified by stakeholders:
1. Students must be able to make changes to the following information:
a Name (due to marital status)
b Marital status
c. Home address
d. Home telephone number
e. Email address
f. Mobile telephone number
g. Contact details in case of emergency
2 Only Reception staff must have access to the information held.
3 The system must support 2000 concurrent users and details updated on the system within 20 seconds.
4. Interoperability of the new system with the other systems maintained by the University for student Registrations.
Test analysis for functional and non-functional testing has iust bequn and the following test conditions have been identified:

Which one of the following is a valid test condition that is missing from the table of test conditions and has clear traceability back to the test strategy and requirements?
SELECT ONE OPTION
The following requirements have been identified by stakeholders:
1. Students must be able to make changes to the following information:
a Name (due to marital status)
b Marital status
c. Home address
d. Home telephone number
e. Email address
f. Mobile telephone number
g. Contact details in case of emergency
2 Only Reception staff must have access to the information held.
3 The system must support 2000 concurrent users and details updated on the system within 20 seconds.
4. Interoperability of the new system with the other systems maintained by the University for student Registrations.
Test analysis for functional and non-functional testing has iust bequn and the following test conditions have been identified:

Which one of the following is a valid test condition that is missing from the table of test conditions and has clear traceability back to the test strategy and requirements?
SELECT ONE OPTION
Question 23
Refer to SCENARIO 2 - You have been tasked with recruiting testers for Project 3 to help design and run regression tests, you have been provided with a skills matrix for four prospective candidates. The matrix shows the skill level (High or Low) for each candidate:

Which candidate would be the MOST suitable for a test analyst role on Project 3?
SELECT ONE OPTION

Which candidate would be the MOST suitable for a test analyst role on Project 3?
SELECT ONE OPTION
Question 24
Risks should be constantly reviewed. Given the current situation, which one of the following factors is most likely to lead to a revised view of product risk? 3 credits
Question 25
You are the Test Manager on a new project. The schedule is aggressive and will require the team to work at peak efficiency. The requirements are not well defined yet, but it is clear that the project will be using new technologies. To help the developers meet the development schedule, an offshore group will be added to the development team.
At this time there is not enough budget to add more testing resources. The project stakeholders are very concerned about the quality of delivered product and will be watching the project closely, particularly during the testing cycles. The exit criteria from the system test level require no open high priority/severity defects, 100% pass rate for all test cases covering risks that are classified as
"high" or "very high", 90% pass rate for all "medium" risks and 50% pass rate for all "low" and "very low" risks.
Given this information, which lifecycle model should you recommend?[3]
At this time there is not enough budget to add more testing resources. The project stakeholders are very concerned about the quality of delivered product and will be watching the project closely, particularly during the testing cycles. The exit criteria from the system test level require no open high priority/severity defects, 100% pass rate for all test cases covering risks that are classified as
"high" or "very high", 90% pass rate for all "medium" risks and 50% pass rate for all "low" and "very low" risks.
Given this information, which lifecycle model should you recommend?[3]