Question 1

What are some uses for the low-level code assigned to each material?
  • Question 2

    How can you limit the validity of a bill of material (BOM)?
  • Question 3

    Your project used process orders for the production of liquid chemicals.
    What can you define to ensure that the production flow happens only in physically connected tanks?
  • Question 4

    What happens to this dependent requirement when you convert the planned order into a production order?
  • Question 5

    You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?