Question 26

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
  • Question 27

    Which information is required when you created a production master in SAP S/4HANA?
  • Question 28

    Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
  • Question 29

    You set up a material as a phantom assembly by entering the special procurement key in the material master.
    How can you switch off the phantom assembly in a specific bill of material (BOM)?
  • Question 30

    What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?