Question 26
Why is a builder's lien holdback important?
Question 27
A civil engineering technologist has been given the task of drawing a foundation plan for a building that measures 20 m × 30 m. The drawing will be produced on a C1 sized sheet, which measures 648 mm × 917 mm. Which of the following is the best scale for the plan?
Question 28
A developer is planning to build an office building on a 4-acre parcel of land. Which of the following documents will tell the developer how much fill to bring to the site to make it level?
Question 29
A contractor is using a compactor on a hot and dry day and quickly compacts a dry 300 mm thickness of sub- base without adding water. The soil is near optimum moisture. A civil engineering technologist completes compaction tests and finds that specifications have not been achieved. What should be done?
Question 30
A civil engineering technologist asked an engineer in training (EIT) to write a deficiency report. After a few revisions, the report is still disorganized and has errors. What would be an appropriate action to take for the technologist?