Question 6

A customer is planning a multi-threaded HPC solution that would benefit from threads running in parallel.
The architect selects the HPE Apollo 6000 and needs to choose between the HPE XL230a and the XL250a compute tray.
What is one reason for choosing the XL250a tray?
  • Question 7

    An architect is determining the amount of memory to propose for an HPE XL230a compute tray.
    The customer specifies several requirements, properties, and parameter of the application.
    Which factor will critically affect the memory amount requirement to prevent a potential memory bottleneck?
  • Question 8

    During a data center transformation discussion, an architect obtains the following customer information:
    core business depends heavily on advanced data modelling techniques that has been developed internally infrastructure in use takes anywhere from 10 hours to five days to complete complex data models for the various development teams that rely on them has a proud reputation as an "environmentally friendly" Fortune 500 company increasing productivity of its development team is the highest priority
    Which large scale HPC solution should the architect recommend to help the customer achieve its transformation goals?
  • Question 9

    A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the architect that the planned purchase of 40GbE switches has been postponed. The customer still intends to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used. These switches are HPE network switches located 25 meters from the location of the racks that house the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth.
    Which action should the architect recommend to allow the customer to deploy the solution immediately and easily take advantage of 40GbE when deployed later?
  • Question 10

    An architect is presenting a file-based transcoding solution to a customer. The solution will include a single HPE Moonshot 1500 chassis that will be directly connected to HPE Apollo 4530 storage via 4 x QSFP uplinks.
    The customer is concerned about the significant traffic that will generated between the HPE Moonshot 1500 chassis and the HPE Apollo 4530 storage.
    Which factor should the architect design into the solution to address the customer's concerns?