Question 26

A customer has a large Oracle-based ERP solution that runs on HPUX and multiple rx2800 i2 servers. The customer plans to move to an open source solution to reduce operating expenses. The customer needs the ability to deliver incremental capacity and needs to avoid incremental Oracle licensing costs.
Which HPE Server solution will help meet the customer's needs?
  • Question 27

    View the Exhibit.


    Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support a customer application virtualization solution. The customer indicated that the maximum acceptable response time for the solution is three seconds. The architect has implemented a POC and tested a single cartridge with different numbers of user sessions.
    The architect monitored resource utilization throughout the tests. The results of the test with the point at which the response time exceeded three seconds are shown, marked as the "VSI max." What should the architect conclude from this test?
  • Question 28

    An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application.
    The architect originally proposed the following:
    m710 cartridges

    HPE 45XGc switches

    HPE 4-QSFP+ Uplink Modules

    The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage.
    Cartridge nodes needs two 10GbE ports each.
    What does the architect need to replace in the solution to meet the customer's new requirements?
  • Question 29

    An architect takes the following notes during a meeting with a customer:
    plans to introduce an entirely new service offering to customers
    servers will be virtualized and will consume large amounts of storage space project is to operate in an isolated section of the data center with limited access to the corporate network need flexibility to grow quickly as required by the new service demands on the infrastructure has no repeatable process for firmware management concerned about how long it will take for the project team to become productive on the new infrastructure Which solution should the architect propose to help the customer overcome all of its project challenges?
  • Question 30

    A customer recently purchased an HPE Moonshot chassis to host its internal website.
    Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform.
    What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?