Question 16
While surveying a potential three-phase project, an installer measures the voltage at the point of utility interconnection. The results are as follows:
* Phase to phase: 240V
* Phase A neutral: 120V
* Phase B neutral: 208V
* Phase C neutral: 120V
Which is a likely cause of these reading?
* Phase to phase: 240V
* Phase A neutral: 120V
* Phase B neutral: 208V
* Phase C neutral: 120V
Which is a likely cause of these reading?
Question 17
According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?
Question 18
Which temperature coefficient is used in the calculation to verify energy production of a PV system?
A)

B)

C)

D)

A)

B)

C)

D)

Question 19
Which of the following MUST be referenced for determining a site's design wind speed?
Question 20
A dwelling has a 200A main load center with a 150 main breaker. Which of the following is the MOST powerful 240V inverter that can be installed in the house using the existing main panelboard with a backfed breaker?
Premium Bundle
Newest PVIP Exam PDF Dumps shared by BraindumpsPass.com for Helping Passing PVIP Exam! BraindumpsPass.com now offer the updated PVIP exam dumps, the BraindumpsPass.com PVIP exam questions have been updated and answers have been corrected get the latest BraindumpsPass.com PVIP pdf dumps with Exam Engine here: