Question 16

Refer to the exhibit.

After applying IPsec, the engineer observed that the DMVPN tunnel went down, and both spoke-to-spoke and hub were not establishing. Which two actions resolve the issue? (Choose two.)
  • Question 17

    Refer to the exhibit.

    After a security audit, the administrator implemented an ACL in the route reflector. The RR became unreachable from any router in the network. Which two actions resolve the issue? (Choose two.)
  • Question 18

    Refer to the exhibit.

    An engineer configured BGP between routers R1 and R3 The BOP peers cannot establish neighbor adjacency to be able to exchange routes. Which configuration resofves this issue?
  • Question 19

    Refer to the exhibit.


    All the serial between R1, R2, and R3 have the Same bandwidth. User on the 192.168.1.0/24 network report slow response times while they access resource on network 192.168.3.0/24. When a traceroute is run on the path. It shows that the packet is getting forwarded via R2 to R3 although the link between R1 and R3 is still up. What must the network administrator to fix the slowness?
  • Question 20

    Refer to the exhibit.

    An engineer has configured R1 as EIGRP stub router. After the configuration, router R3 failed to reach to R2 loopback address.
    Which action advertises R2 loopback back into the R3 routing table?