Question 91

Universal Containers has aslab Discount Schedule for Product A with these Discount Tiers:

If Product A has a List Price of $100.00, what is the Net Total for a Quote Line with the quantity of 21?
  • Question 92

    What is the correct order of data import to load Quote Template in CPQ?
  • Question 93

    Universal Containers has two products:
    *C-STOR-L, which is a Large Storage Container.
    *C-LID-L, which is a lid for a Large Storage Container.
    These are Product Options within the same bundle. C-STOR-L is required before C-LID-L is selected in the bundle. The Admin wants to create an Option Constraint.
    What field should C-LID-L be stored in to meet this requirement?
  • Question 94

    An Admin has made numerous changes to a Template Content record over the course of a day, and now finds that the "Failed to Load PDF" error message appears when the output document is generated. Which steps should the Admin perform to diagnose the Error?
  • Question 95

    The Admin wants to ensure that within one bundle. Products A and B cannot both be added to the quote. During Configuration, the user should be able to freely switch between these options. If a user selects both, the system should only add Product A to the quote rather than product B.
    Which setup should the Admin use to meet these requirements?