Question 31
Which of the following heating systems uses Coefficient of Performance (COP) as a measure of efficiency in the EDGE software?
Correct Answer: C
In EDGE, the Coefficient of Performance (COP) is used to measure the efficiency of heating systems that produce heat using a refrigeration cycle, such as heat pumps. The EDGE Methodology Report specifies: "The Coefficient of Performance (COP) is used in EDGE to evaluate the efficiency of heat pumps, including ground source heat pumps, where it is defined as the ratio of thermal output to electrical input. This metric is not applied to direct heating systems like electric heaters or boilers" (EDGE Methodology Report Version 2.0, Section 5.1: Energy Efficiency Metrics). Option C, ground source heat pump, fits this description as it operates using a refrigeration cycle to transfer heat, and its efficiency is measured by COP in EDGE. Option A (electric heater) has an efficiency typically measured as 100% (or COP of 1), but EDGE does not use COP for such systems, as noted: "Electric heaters are assumed to have a fixed efficiency in EDGE, not evaluated via COP" (EDGE User Guide, Section 4.2: Energy Efficiency Measures). Option B (condensing boiler) uses thermal efficiency (%), not COP, as per: "Boilers in EDGE are assessed by their thermal efficiency, not COP" (EDGE Methodology Report Version 2.0, Section 5.2: Heating Systems). Option D (sensible heat recovery from exhaust air) is a heat recovery method, not a heating system, and does not use COP: "Heat recovery systems are evaluated by their heat recovery effectiveness, not COP" (EDGE User Guide, Section 4.3:
Ventilation Measures). Thus, ground source heat pump (Option C) is the correct choice.
Reference: EDGE Methodology Report Version 2.0, Section 5.1: Energy Efficiency Metrics, Section 5.2:
Heating Systems; EDGE User Guide Version 2.1, Section 4.2: Energy Efficiency Measures, Section 4.3:
Ventilation Measures.
Ventilation Measures). Thus, ground source heat pump (Option C) is the correct choice.
Reference: EDGE Methodology Report Version 2.0, Section 5.1: Energy Efficiency Metrics, Section 5.2:
Heating Systems; EDGE User Guide Version 2.1, Section 4.2: Energy Efficiency Measures, Section 4.3:
Ventilation Measures.
Question 32
Which of the following must be included in the EDGE Auditor submission for Preliminary Certification?
Correct Answer: C
The EDGE Auditor's submission for Preliminary Certification (design stage) must include specific elements to support the recommendation for certification. The EDGE Certification Protocol specifies: "For Preliminary Certification, the EDGE Auditor's submission must include compliance documents for the selected measures, such as drawings, specifications, and manufacturer's data sheets, which verify that the design aligns with the self-assessment in the EDGE software. These documents are reviewed by the Certification Provider to confirm eligibility" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option C, compliance documents for selected measures, directly matches this requirement. Option A (all available design data) is too broad and not required: "Only documents directly related to the selected measures are needed, not all design data" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option B (Chapter 5 EDGE certification protocol) is incorrect, as this refers to the protocol document itself, not a submission component:
"The certification protocol is a reference, not part of the Auditor's submission" (EDGE Certification Protocol, Section 1.1: Overview). Option D (design audit site visit results) is incorrect, as site visits are not required at the design stage: "Preliminary Certification is based on a desk audit, not a site visit, which occurs at the post- construction stage" (EDGE Certification Protocol, Section 3.3: Certification Decision). Thus, compliance documents (Option C) are required in the submission.
Reference:EDGE Certification Protocol, Section 3.2: Audit Requirements, Section 3.3: Certification Decision, Section 1.1: Overview.
"The certification protocol is a reference, not part of the Auditor's submission" (EDGE Certification Protocol, Section 1.1: Overview). Option D (design audit site visit results) is incorrect, as site visits are not required at the design stage: "Preliminary Certification is based on a desk audit, not a site visit, which occurs at the post- construction stage" (EDGE Certification Protocol, Section 3.3: Certification Decision). Thus, compliance documents (Option C) are required in the submission.
Reference:EDGE Certification Protocol, Section 3.2: Audit Requirements, Section 3.3: Certification Decision, Section 1.1: Overview.
Question 33
The EDGE Preliminary Certificate is issued by the EDGE:
Correct Answer: C
The issuance of certificates in the EDGE certification process is a defined responsibility assigned to specific roles. The EDGE Certification Protocol states: "The EDGE Preliminary Certificate, awarded at the design stage, is issued by the EDGE Certification Provider after the Auditor submits a recommendation for certification based on the design audit. The Certification Provider reviews the Auditor's report and, if compliant, issues the certificate" (EDGE Certification Protocol, Section 3.3: Certification Decision). Option C, Certification Provider, aligns with this process, as entities like GBCI are responsible for issuing certificates. Option A (Auditor) is incorrect, as Auditors only recommend certification: "The Auditor's role is to provide a recommendation, not to issue the certificate" (EDGE Expert and Auditor Protocols, Section 2.2:
Roles of EDGE Auditor). Option B (Expert) is also incorrect, as Experts advise on design, not certification:
"EDGE Experts assist with project design and self-assessment, not certification issuance" (EDGE Expert and Auditor Protocols, Section 2.1: Roles of EDGE Expert). Option D (Operations and Management Team) is wrong, as this team supports the overall program, not individual certifications: "The EDGE Operations and Management Team oversees program development, not certificate issuance" (EDGE Certification Protocol, Section 1.3: Program Structure). Thus, the Preliminary Certificate is issued by the Certification Provider (Option C).
Reference:EDGE Certification Protocol, Section 3.3: Certification Decision, Section 1.3: Program Structure; EDGE Expert and Auditor Protocols, Section 2.1: Roles of EDGE Expert, Section 2.2: Roles of EDGE Auditor.
Roles of EDGE Auditor). Option B (Expert) is also incorrect, as Experts advise on design, not certification:
"EDGE Experts assist with project design and self-assessment, not certification issuance" (EDGE Expert and Auditor Protocols, Section 2.1: Roles of EDGE Expert). Option D (Operations and Management Team) is wrong, as this team supports the overall program, not individual certifications: "The EDGE Operations and Management Team oversees program development, not certificate issuance" (EDGE Certification Protocol, Section 1.3: Program Structure). Thus, the Preliminary Certificate is issued by the Certification Provider (Option C).
Reference:EDGE Certification Protocol, Section 3.3: Certification Decision, Section 1.3: Program Structure; EDGE Expert and Auditor Protocols, Section 2.1: Roles of EDGE Expert, Section 2.2: Roles of EDGE Auditor.
Question 34
Which of the following passive design features is considered within the EDGE calculation methodology?
Correct Answer: B
Passive design features in EDGE focus on reducing energy demand through architectural and design strategies that minimize the need for active systems. The EDGE User Guide lists passive design measures included in its methodology: "Passive design features in EDGE include external shading, natural ventilation, insulation, and high-reflectivity materials, which reduce energy demand for heating, cooling, and lighting by leveraging climate and site conditions" (EDGE User Guide, Section 3.5: Passive Design Strategies). Option B, external shading, is explicitly mentioned as a passive design feature that reduces solar heat gain, thereby lowering cooling energy needs. Option A (lighting controls) is an active measure, not passive, as it involves electrical systems. Option C (renewable energy) is an energy generation measure, not a passive design strategy, as noted in the EDGE Methodology Report: "Renewable energy systems like solar PV are treated as energy supply measures, not passive design" (EDGE Methodology Report Version 2.0, Section 5.3: Energy Measures). Option D (efficient cooling system) is also an active system, not passive. Thus, external shading (Option B) is the correct passive design feature within EDGE's calculation methodology.
Reference:EDGE User Guide Version 2.1, Section 3.5: Passive Design Strategies; EDGE Methodology Report Version 2.0, Section 5.3: Energy Measures.
Reference:EDGE User Guide Version 2.1, Section 3.5: Passive Design Strategies; EDGE Methodology Report Version 2.0, Section 5.3: Energy Measures.
Question 35
Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?
Correct Answer: C
The post-construction stage in EDGE certification requires evidence to confirm that the efficiency measures claimed in the design stage have been implemented as specified. For window glazing, which affects energy efficiency through its U-value (thermal transmittance) and SHGC (Solar Heat Gain Coefficient), the EDGE Certification Protocol provides clear requirements: "At the post-construction stage, the Client must provide manufacturer's data sheets for the window glazing measure, showing the make and model, U-value, and SHGC of the installed glass, to confirm that the glazing matches the specifications claimed in the self- assessment and meets the energy efficiency requirements" (EDGE Certification Protocol, Section 3.4: Post- Construction Requirements). Option C, manufacturer's data sheets showing the make and model, U-value, and SHGC of the installed glass, directly matches this requirement, as it provides the specific technical data needed to verify compliance. Option A (design building elevations marking the window glass specifications) is relevant at the design stage, not post-construction: "Design elevations are required at the preliminary stage to show intended glazing specifications, not after construction" (EDGE Certification Protocol, Section 3.2:
Audit Requirements). Option B (bill of quantities with specifications highlighted) is insufficient on its own, as it may not provide detailed technical data: "Bills of quantities may support purchase verification, but manufacturer's data sheets are required for technical specifications like U-value and SHGC" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements). Option D (window schedule showing major glass types) is helpful but not sufficient, as it lacks the detailed technical data: "Window schedules may indicate glass types, but they do not replace the need for manufacturer's data sheets with U-value and SHGC at post-construction" (EDGE User Guide, Section 6.2: Documentation Requirements). The EDGE User Guide further clarifies: "For glazing measures, post-construction evidence must confirm the installed product's performance through manufacturer's data sheets, ensuring alignment with the design-stage claims" (EDGE User Guide, Section 4.1: Insulation Measures). Thus, manufacturer's data sheets (Option C) are required at the post-construction stage.
Reference:EDGE Certification Protocol, Section 3.4: Post-Construction Requirements, Section 3.2: Audit Requirements; EDGE User Guide Version 2.1, Section 6.2: Documentation Requirements, Section 4.1:
Insulation Measures.
Audit Requirements). Option B (bill of quantities with specifications highlighted) is insufficient on its own, as it may not provide detailed technical data: "Bills of quantities may support purchase verification, but manufacturer's data sheets are required for technical specifications like U-value and SHGC" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements). Option D (window schedule showing major glass types) is helpful but not sufficient, as it lacks the detailed technical data: "Window schedules may indicate glass types, but they do not replace the need for manufacturer's data sheets with U-value and SHGC at post-construction" (EDGE User Guide, Section 6.2: Documentation Requirements). The EDGE User Guide further clarifies: "For glazing measures, post-construction evidence must confirm the installed product's performance through manufacturer's data sheets, ensuring alignment with the design-stage claims" (EDGE User Guide, Section 4.1: Insulation Measures). Thus, manufacturer's data sheets (Option C) are required at the post-construction stage.
Reference:EDGE Certification Protocol, Section 3.4: Post-Construction Requirements, Section 3.2: Audit Requirements; EDGE User Guide Version 2.1, Section 6.2: Documentation Requirements, Section 4.1:
Insulation Measures.
- Other Version
- 366EDGE.EDGE-Expert.v2026-03-28.q27
- Latest Upload
- 129Databricks.Databricks-Generative-AI-Engineer-Associate.v2026-08-18.q40
- 135SAP.C_CR125_2601.v2026-08-17.q28
- 179Salesforce.Field-Service-Consultant.v2026-08-17.q134
- 150Oracle.1Z0-1170.v2026-08-16.q64
- 156Oracle.1Z1-1170.v2026-08-16.q64
- 193Juniper.JN0-336.v2026-08-13.q60
- 327EMC.NCP-AII.v2026-08-13.q200
- 205CIRO.RSE.v2026-08-12.q41
- 175CrowdStrike.CCSE-204.v2026-08-12.q50
- 161ISQI.CT-GenAI.v2026-08-11.q14
[×]
Download PDF File
Enter your email address to download EDGE.EDGE-Expert.v2026-07-22.q39 Practice Test