Question 11

Showitoff is an organisation spcialising in the design and production of wall decorating material for the domestic market. During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as several rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are visible. When asked about it, the OHS Manager states that he presume that the material come from maintenance work, so it is the Maintenance Manager's responsibility.
The auditor interviews the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess materials that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable collapse at any moment. The Maintenance Manager is not aware of such a situation.
Which three statement represent good audit practice?
  • Question 12

    ISO 45001 requires the organisation to retain OHSMS documented information. From the following list of documented information, which four examples must be retained by the organisation?
  • Question 13

    Showitoff is an organization specialization in the design and production of wall decorating materials for the domestic market.
    During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as serveral rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are available. When asked about it, the OHS Manager states that he presumes that the materials come from maintenance work, so it is the Maintenance Manager's responsibility.
    The auditor interview the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess material that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable and could collapse at any moment. The Maintenance Manager is not aware of such a situation.
    The auditor decides to review the process for evaluation of compliance with health and safety regulations in more depth.
    Select six option that provide a meaningful audit trail for this process.
  • Question 14

    An audit team member assigned to audit the management review and planning processes prepares a work document.
    What is the name of the document prepared by the auditor?
  • Question 15

    What is the definition of the term 'audit' as per clause 3.32 of ISO 45001:2018?