Question 11

Which two statements are the most accurate in regards to scaling Scrum for large projects requiring multiple Scrum Teams? (Choose two.)
  • Question 12

    The relationship between the Product Owner and the Developers has degraded over time. The Developers are growing increasingly angry with the Product Owner for changing the requirements all the time and not being available enough. The Product Owner is angry with the Developers for changing requirements during implementation. What guidance should the Scrum Master offer?
    (Choose the best answer)
  • Question 13

    Select the correct Scrum Team roles defined in Scrum.
  • Question 14

    Which of the following is required in Scrum?
  • Question 15

    Kevin is a senior developer that has recently joined an existing Scrum Team. The existing team members are unable to get along with Kevin and conclude that he is not a culture fit.
    If necessary, who is responsible for removing the new team member, and why?