Question 26

(In a FIDIC Red Book, the Employer shall have prepared (or have prepared by a design consultant) all the design for the Works. Which of the listed documents form the basis for this design (2 correct answers apply))
  • Question 27

    (Which of the following two statements are correct regarding subcontractors under FIDIC Red, Yellow, and Silver Books (edition 2017)?
    Choose all of the correct answers (multiple possibilities).)
  • Question 28

    Under the FIDIC Red, Yellow, and Silver Books (both editions), the Contractor has a contractual obligation to submit a Value Engineering Proposal. Such proposal shall be prepared at the cost of the Employer. Are both these statements true or false?
  • Question 29

    Which two statements are correct regarding the FIDIC Red Book (edition 2017)?
  • Question 30

    (Under FIDIC Red and Yellow Books (both editions) the Engineer must have received technical education. Is this statement true or false?)