Question 11
What is a silt fence used for?
Question 12
The road cross sections shown have chainage (CH) 1+100 and 1+200. What is the volume of sub-grade material if an averaging method is applied?


Question 13
The critical path refers to which of the following series of tasks in a schedule?
Question 14
In which step in this diagram will a general contractor need to consider their bonding capacity?
Question 15
A civil engineering technologist is undertaking a final acceptance review of a subdivision. The technologist finds 35 m of deficient sidewalk and three hydrants which were not tested. As part of final acceptance, what should be done to ensure the hydrants get tested and the sidewalk is repaired?