Question 16
A civil engineering technologist needs to recommend a foundation design for a commercial building. The borehole logs identify unsuitable bearing soils beneath the proposed floor elevation to a depth of 4 m and shallow bedrock at 5 m. Which of the following types of design should the technologist recommend?
Question 17
A contractor fails to make the necessary repairs on the deficiency list within the specified timeline and refuses to return to the site. How should the owner proceed in this situation?
Question 18
Why is it important to keep daily site diaries and inspection data, such as sketches, notes, and photos?
Question 19
A civil engineering technologist who works for a structural consulting firm discovered a conflict between the design and existing site conditions during the construction stage of the project. What type of site instruction should the technologist provide to the contractor to resolve the conflict?
Question 20
A civil engineering technologist asked an engineer in training (EIT) to write a deficiency report. After a few revisions, the report is still disorganized and has errors. What would be an appropriate action to take for the technologist?
