Question 31
A surveyor is laying out the invert elevations of a storm sewer. Centre elevation is 10 m, storm pipe outside diameter is 1 m, and storm sewer pipe wall thickness is 0.05 m. What is the storm sewer invert elevation in the diagram below?


Question 32
The invert elevation of a sanitary sewer line is 98.150 m, the pipe thickness is 12 mm and its outside diameter is 600 mm. Using the image below, what is the crown elevatf m


Question 33
Which of the following situations would cause the most serious delay on a project?
Question 34
A civil engineering technologist is performing a concrete test on a site. What minimum number of cylinders should the technologist make?
Question 35
Which of the following is the most effective way to monitor progress on projects?