Question 26

Based on the diagram below, what is the percentage slope between D1 and C2 if the grid is 10 m × 10 m?
  • Question 27

    A contractor is checking final grade elevation in advance of paving operations. What elevation needs to be confirmed before any asphalt is placed?
  • Question 28

    A concrete mix is onsite and at its specified slump of 80 mm. The pour requires a slump of 200 mm. The concrete onsite meets all other requirements. What action should be taken?
  • Question 29

    EXCERPT FROM MUNICIPAL BYLAW 1234 - ZONING
    Section 3: Single family zone
    3.1 All dwellings shall house one family.
    3.2 All dwellings shall have a minimum main floor area of 120 m².
    3.3 All dwellings shall be constructed a minimum of 10.0 m from the front property line, 15.0 m from the rear property line, and 1.5 m from the side property lines.
    3.4 An application that does not fulfill the above requirements shall be referred to Council.
  • Question 30

    What is the main reason for taking handwritten notes while surveying?