Question 51
As shown in the networking, SWA and SWB enable STP, SWC does not enable STP when initially Link 2 is not connected, PCB can send data to PCA, if Link 1 fails at this time, the maintenance personnel will connect Link 2, then The statement about the recovery process from PCB to PCA data transfer industry is correct (assuming PCA will not actively send data) __


Question 52
Which of the following multicast group management protocols can support the SSM model-(choose one or more)
Question 53
To configure the Ethernet1/0/1 port of the switch SWA as a hybrid port, its PVID is VLAN20, and when sending VLAN20 data frames without tagging, when sending VLAN 10 data frames, then the following configuration Is the process correct (choose one or more)
Question 54
Regarding the MSTP BPDU format, the correct statement is
Question 55
The figure shows the networking application of RRPP. Customer LAN switches SWA, SWB, SWC, and SWD form RRPP ring main ring 1, switches SWB, SWC and SWE form sub-ring 2, and switches SWB, sWC and sWF form sub-ring 3. If Switch SWE is the master node of sub-ring 2, SWF is the master node of sub-ring 3, and switch SWB is the edge node of sub-ring 2 and sub-ring 3. In order to eliminate the defect of broadcast storm under specific conditions of RRPP dual-homing networking, the above information Can know

