Question 6

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?
  • Question 7

    A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first affected by this change?
  • Question 8

    A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?
  • Question 9

    In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?
  • Question 10

    Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?