Question 11

An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?
  • Question 12

    Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?
  • Question 13

    What is the reference standard that defines the requirements for LEED energy modeling?
  • Question 14

    An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?
  • Question 15

    Questions 1-5 are based on the same project scenario. Please use the scenario information when answering.
    A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.
    The original hospital achieved the Gold certification level and was built with the capacity to add three floors-levels six through eight-to the top of the structure. This addition requires partial demolition of the roof and the floor below.
    The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.
    The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.
    The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.
    The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.
    The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.
    Which LEED v5 rating system is appropriate for this project?